Hurricane Isaac

Project Description

As Hurricane ISAAC was bearing down on Stennis Space Center in Mississippi in 2012, the heavy rain was causing havoc for some electrical equipment at the center.

High Performance Solutions was called upon by the Facility Operating Contractor for NASA to help locate a portable generator to install at a building as power failure to the building caused by heavy rain was imminent.

The Facility operating Contractor for NASA indicated that they had exhausted all of their options and was seeking assistance to find a generator before the rain soaked equipment caused a power failure.

High Performance Solutions located a 750KW portable generator and had it onsite in the middle of a Hurricane within 5 hours.